MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users., This news data comes from:http://ycyzqzxyh.com
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
ERC amends net-metering rules to expand renewable energy options
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
ERC amends net-metering rules to expand renewable energy options

In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Philippine forces deliver supplies and personnel to disputed South China Sea shoal despite tensions
- SC acquits suspect in 2012 killing of Dutch aid worker over doubtful testimonies
- DSWD program reduced hunger
- DPWH engineer denies role in Bulacan flood control ‘ghost projects’
- Hontiveros pushes P15,000 salary hike for teachers
- COA probes Iqbal on spending of P1.7B in one day
- Bonoan freezes DPWH travel passes
- One in four people lack access to safe drinking water – UN
- Van Gogh Museum 'could close' without more help from Dutch govt
- Lacson seeks probe of 2 PH contractors' board members for conflict of interest